| Glue Benefits :: Lifecycle |


|
Supporting the Extended Lifecycle Management
- Scalable for tens of users to hundreds to thousands.
- Custom viewers for specific corporate applications.
- Review and collaborate on 2D and 3D building systems (mechanical, electrical, structural, etc.).
- Capture and communicate visual issues in the context of the 3D model.
- Unprecedented digital mockups for even the largest assemblies and most complex geometries.
- Advanced spatial analysis tools with the same precision as the original BIM data.
- Tight integration with building lifecycle support for design management in-situ.
- Open standard for 3D visualization and common 3D language for building lifecycle visualization, collaboration and building systems interoperability.
Glue Value
- Make better decisions earlier by eliminating ambiguity and streamlining processes.
- Improve productivity by providing digital design BIM data to all decision-makers.
- Increase innovation and performance through the use of BIM.
- Reduce resolution times and costs by utilizing visual BIM data at earlier stages.
- Manage the impact of change and improve quality.
- Reduce or eliminate costly and time-consuming physical prototypes by replacing with BIM digital prototyping.)
- Minimize re-work of errors found by validating designs simply and easily.
- Save money by minimizing costly BIM authoring licenses.
|
|
|
|
|
Copyright © Horizontal LLC 2009 |